Open Map
Close Map
N
Projections and Nav Modes
  • Normal View
  • Fisheye View
  • Architectural View
  • Stereographic View
  • Little Planet View
  • Panini View
Click and Drag / QTVR mode
Dieses Panorama mit anderen teilen
For Non-Commercial Use Only
This panorama can be embedded into a non-commercial site at no charge. Lesen Sie mehr
Do you agree to the Terms & Conditions?
For commercial use, Kontaktieren Sie uns
Embed this Panorama
BreiteHöhe
For Non-Commercial Use Only
For commercial use, Kontaktieren Sie uns
LICENSE MODAL

0 Likes

Irsching Power Station Bavaria Germany
Oberbayern

Irsching Power Station near Vohburg at the Danube, Germany, is operated as a so-called Peaking power plant.

From the original three units only unit 3 with a capacity of 415 MW is operated, the older two units, with a capacity of 151 MW (unit 1) and 312 MW (unit 2), are in cold reserve. The power station can be operated with light fuel oil and with natural gas. The owner and operator of the units 3 and 4 is Uniper, a subsidiary of E.ON Energy, while Unit 5, also operated by Uniper, is owned by Gemeinschaftskraftwerke Irsching, a joint venture of Uniper, Nuremberg's N-ERGIE, Mainova and HEAG Südhessische Energie.On December 20, 2007, a planned 18-month trial operation period of Siemens SGT5-8000H, the world's largest and most powerful gas turbine (capable of generating 375MW), started. After trial period the plant expanded to a high-efficiency combined-cycle power plant with a total output of about 570 MW[2] and an efficiency of 60%. The unit 4 was commissioned in 2011.

An additional unit 5 was built, consisting of two smaller gas turbines and one steam turbine. This unit has capacity of 860 MW of electricity with an efficiency of 58%. It was commissioned in 2010.

Due to the growth of Renewable energy in Germany which often covers daytime peak demand with solar power, the owners claim that they lose several million € a year. On March 30, 2015, the owners of unit 5, organised as Gemeinschaftskraftwerk Irsching GmbH (GKI), declared they wanted to close down all of its operations effective from April 1, 2016.This was denied, as due to the shutdown of nuclear power, network operator TenneT considers all power plants in its Southern German area as system relevant and having to remain as stand-by reserve. The operators demand better compensation for that.

Another request for shutdown of unit 5 was denied in August 2017, as Tennet again demanded from GKI that, according to Netzreserveverordnung, unit 5 remains operational, despite double digit M€ losses. GKI claims that Tennet plans to build similar gas powered peaker plants which are, unlike GKI's unit 5, entitled to compensation.

Copyright: Willy Kaemena
Art: Spherical
Resolution: 16500x8250
Taken: 30/07/2012
Hochgeladen: 09/08/2012
Published: 15/09/2021
Angesehen:

...


Tags:
Mehr über Oberbayern

Oberbayern liegt im Südosten des Freistaats Bayern und grenzt im Süden und Osten an Österreich, im Nordosten an Niederbayern und die Oberpfalz, im Nordwesten an Mittelfranken und im Westen an Schwaben. Verwaltungssitz des Bezirks und gleichzeitig Regierungssitz des Regierungsbezirks ist München. Oberbayerns Grenzen haben sich im Laufe der Jahrhunderte mehrfach verändert. Insbesondere gibt es keinen spezifisch oberbayerischen Dialekt. Der Begriff „Oberbayern“ erscheint zum ersten Mal im Jahre 1255 bei der bayerischen Landesteilung. Die Ausdehnung war jedoch ursprünglich eine andere: Der Chiemgau und die Gegend von Bad Reichenhall gehörten damals zu Niederbayern.


It looks like you’re creating an order.
If you have any questions before you checkout, just let us know at [email protected] and we’ll get right back to you.